Largest 89.077m2 (8.9 Hectare, 22 Acre, nearly 1 million square foot) remaining plot available near Audi and Raba factories
Water, sewage, gas mains and industrial electricity supply available.
1Gb Fibre Optic Broadband internet available
Plot covered by all 4G+ mobile networks, 5G available soon.
Two industrial railway line with two gates for convenient railway access.
Easy road access from highway for large motor vehicles.
The property located in 9027 Gyor, Land registry numbers 5792/1,5792/3,5792/4, Registered as Industrial Land.
All mains supply available.
The plot is flat and walled all around with a 3 metre high brick wall.
Presently no buildings on the plot.
Location:
5 minutes from Gyor Airport
30 minutes away from Bratislava Airport
1 hour away from Vienna Airport
1 hour 20 minutes away from Budapest Airport
2 hours away from Graz Airport
Gyor is the home of Audi Motor Manufacturing Company with great transport links to road, rail, airports and the river Danube ports.
The area is in great position to supply the Central European car manufacturing industry and they supporting factories. (Audi, Raba and credo in Győr, Hungary, Suzuki in Esztergom, Hungary, psa in Szentgotthard, Hungary, Mercedes-Benz in Kecskemet, Hungary, bmw in Debrecen, Hungary, Jaguar-Land Rover in Nitra, Slovakia and Graz, Austria, vw and Skoda in Bratislava, Slovakia, psa in Trnava, Slovakia, kia in Zilina, Slovakia, Hyundai in Nosovice, Czech Republic.)